Free tool
AI Data Center Power Calculator
Estimate the power your AI deployment needs.
Enter racks or GPUs, PUE and utilisation to estimate IT load, total facility power, cooling overhead and annual energy. Results use only your inputs and plain arithmetic.
Estimate
- IT load0.400 MW
- 400 kW
- Total facility powerIT load × PUE
- 0.52 MW
- Cooling and other overheadTotal facility power − IT load
- 0.12 MW
- Annual energyAt the utilisation you entered
- 3,644 MWh/year
- Heat to reject (approx.)Nearly all IT power becomes heat
- 400 kW
Method
How this is calculated
- IT load equals the number of racks times the average kW per rack, or the number of GPUs times watts per GPU, divided by 1,000.
- Total facility power equals IT load times PUE.
- Cooling and other overhead equals total facility power minus IT load.
- Annual energy equals total facility power times utilisation times 8,760 hours in a year.
- Heat to reject is roughly equal to IT load, because nearly all power used by IT equipment becomes heat.
Limits
What this doesn't tell you
This is a first-pass estimate. Grid connection capacity, redundancy (N+1, 2N), climate and cooling design all change the real number a site needs to secure and deliver.
Planning a deployment? See how a powered shell or a build-to-suit facility can be scoped around your load.
Link to this tool
<a href="https://neoversetechnologies.com/tools/ai-power-calculator">AI Data Center Power Calculator by Neoverse Technologies</a>Turn your estimate into a deliverable plan.
Share your infrastructure requirements with our Abu Dhabi development team.